NMAC Logo
TITLE 19 - NATURAL RESOURCES AND WILDLIFE

CHAPTER 14

GEOTHERMAL POWER

   
19.14.1 NMAC GENERAL PROVISIONS - DEFINITIONS
19.14.2 - 19 NMAC [RESERVED] PARTS 2 - 19  
19.14.20 NMAC PLUGGING BOND
19.14.21 NMAC DRILLING PERMIT
19.14.22 NMAC SIGN ON WELLS
19.14.23 NMAC WELL SPACING
19.14.24 NMAC ROTARY DRILLING AND CABLE TOOL DRILLING
19.14.25 NMAC DRILLING MUD AND MUD PITS
19.14.26 NMAC SEALING OFF STRATA
19.14.27 NMAC CASING AND CEMENTING REQUIREMENTS
19.14.28 NMAC DEVIATION TESTS AND DIRECTIONAL DRILLING
19.14.29 NMAC SHOOTING AND CHEMICAL TREATMENT OF WELLS
19.14.30 NMAC RIGHT OF ENTRY
19.14.31 NMAC NOISE ABATEMENT
19.14.32 NMAC SAFETY REGULATIONS
19.14.33 NMAC WELL HEADS AND PRODUCTION EQUIPMENT
19.14.34 NMAC CORROSION
19.14.35 NMAC DISPOSAL OF PRODUCED WATERS
19.14.36 NMAC NOTIFICATION OF FIRE, BREAKS, LEAKS, SPILLS AND BLOWOUTS
19.14.37 NMAC MEASUREMENT OF PRODUCTION
19.14.38 NMAC UTILIZATION OF GEOTHERMAL RESOURCES
pdf version
19.14.39 - 50 NMAC [RESERVED] PARTS 39 - 50  
19.14.51 NMAC GENERAL
19.14.52 NMAC APPLICATION FOR PERMIT TO DRILL, DEEPEN OR PLUG BACK--GEOTHERMAL RESOURCES
19.14.53 NMAC GEOTHERMAL RESOURCES WELL LOCATION AND ACREAGE DEDICATION PLAT
19.14.54 NMAC SUNDRY NOTICES AND REPORTS ON GEOTHERMAL RESOURCES WELL
19.14.55 NMAC CERTIFICATE OF COMPLIANCE AND AUTHORIZATION TO PRODUCE GEOTHERMAL RESOURCES
19.14.56 NMAC GEOTHERMAL RESOURCES WELL LOG
19.14.57 NMAC GEOTHERMAL RESOURCES WELL SUMMARY REPORT
19.14.58 NMAC GEOTHERMAL RESOURCES WELL HISTORY
19.14.59 NMAC MONTHLY GEOTHERMAL PRODUCTION REPORT
19.14.60 NMAC MONTHLY GEOTHERMAL PURCHASER'S REPORT
19.14.61 NMAC MONTHLY GEOTHERMAL INJECTION REPORT MONTHLY GEOTHERMAL INJECTION REPORT
19.14.62 NMAC ANNUAL GEOTHERMAL TEMPERATURE AND PRESSURE TESTS
19.14.63 NMAC APPLICATION TO PLACE WELL ON INJECTION-GEOTHERMAL RESOURCES
19.14.64 - 70 NMAC [RESERVED] PARTS 64 - 70  
19.14.71 NMAC GEOTHERMAL POWER LIABILITY
19.14.72 NMAC GEOTHERMAL POWER NOTICE
19.14.73 NMAC GEOTHERMAL POWER PLUGGING AND TEMPORARY ABANDONMENT
19.14.74 NMAC GEOTHERMAL POWER, WELLS MAY BE USED FOR FRESH WATER
19.14.75 - 80 NMAC [RESERVED] PARTS 75 - 80  
19.14.81 NMAC GEOTHERMAL POWER, ILLEGAL SALE PROHIBITED
19.14.82 NMAC GEOTHERMAL POWER, RATABLE TAKE
19.14.83 NMAC REGULATION OF GEOTHERMAL RESOURCES PRODUCTION
19.14.84 - 90 NMAC [RESERVED] PARTS 84 - 90  
19.14.91 NMAC GEOTHERMAL INJECTION WELLS
19.14.92 NMAC GEOTHERMAL DISPOSAL WELLS
19.14.93 NMAC GEOTHERMAL POWER, METHOD OF MAKING APPLICATION
19.14.94 NMAC GEOTHERMAL POWER, INJECTION REPORTS
19.14.95 NMAC GEOTHERMAL POWER, SURVEILLANCE
19.14.96 NMAC GEOTHERMAL POWER, ABANDONMENT
19.14.97 - 100 NMAC [RESERVED] PARTS 97 - 100  
19.14.101 NMAC GEOTHERMAL POWER, GENERAL
19.14.102 NMAC GEOTHERMAL POWER, BLOWOUT PREVENTION EQUIPMENT
19.14.103 NMAC GEOTHERMAL POWER, AREAS WITH HISTORY OF BLOWOUTS
19.14.104 NMAC GEOTHERMAL POWER, TESTING OF BLOWOUT PREVENTION EQUIPMENT
19.14.105 - 109 NMAC [RESERVED] PARTS 105 - 109  
19.14.110 NMAC GEOTHERMAL POWER, NECESSITY FOR HEARING
19.14.111 NMAC GEOTHERMAL POWER, EMERGENCY ORDERS
19.14.112 NMAC GEOTHERMAL POWER, METHOD OF INITIATING A HEARING
19.14.113 NMAC GEOTHERMAL POWER, METHOD OF GIVING LEGAL NOTICE FOR HEARING
19.14.114 NMAC GEOTHERMAL POWER, CONTENTS OF NOTICE OF HEARING
19.14.115 NMAC GEOTHERMAL POWER, PERSONAL SERVICE OF NOTICE
19.14.116 NMAC GEOTHERMAL POWER, PREPARATION OF NOTICES
19.14.117 NMAC GEOTHERMAL POWER, FILING PLEADINGS: COPY DELIVERED TO ADVERSE PARTY OR PARTIES
19.14.118 NMAC GEOTHERMAL POWER, CONTINUANCE OF HEARING WITHOUT NEW SERVICE
19.14.119 NMAC GEOTHERMAL POWER, CONDUCT OF HEARINGS
19.14.120 NMAC GEOTHERMAL POWER, POWER TO REQUIRE ATTENDANCE OF WITNESSES AND PRODUCTION OF EVIDENCE
19.14.121 NMAC GEOTHERMAL POWER, RULES OF EVIDENCE
19.14.122 NMAC GEOTHERMAL POWER, EXAMINERS QUALIFICATIONS AND APPOINTMENT
19.14.123 NMAC GEOTHERMAL POWER, REFERAL OF CASES TO EXAMINERS
19.14.124 NMAC GEOTHERMAL POWER, EXAMINER'S POWER AND AUTHORITY
19.14.125 NMAC GEOTHERMAL POWER, HEARINGS MUST BE HELD BEFORE THE COMMISSION
19.14.126 NMAC GEOTHERMAL POWER, EXAMINER'S MANNER OF CONDUCTING HEARINGS
19.14.127 NMAC GEOTHERMAL POWER, REPORT AND RECOMMENDATIONS, EXAMINER'S HEARING
19.14.128 NMAC GEOTHERMAL POWER, DISPOSITION OF CASES HEARD BY EXAMINERS
19.14.129 NMAC GEOTHERMAL POWER, DE NOVO HEARING BEFORE COMMISSION
19.14.130 NMAC GEOTHERMAL POWER, NOTICE OF COMMISSION AND DIVISION ORDERS
19.14.131 NMAC GEOTHERMAL POWER, REHEARINGS
19.14.132 NMAC GEOTHERMAL POWER, CHANGES IN FORMS AND REPORTS
     
Return to Title 19 page
Return to NMAC Titles List
Return to NMAC homepage